Traffic Department

 Work permit (infrastructure)

Recipients

  • Companies, contractors, citizens, governmental and official institutions.

Place

  • The main center: Traffic Planning Branch / Institutional Development Department / Traffic Department.
  • Alternative places: Traffic sections specialized in the governorates.

Conditions

  • This permit is not granted to operations: (electricity emergencies, water emergencies, telecommunications emergencies) unless they have obtained approval from the Municipality of Amman or the Ministry of Public Works or Municipalities, each according to its competence, as they are the authorities authorized in this regard on the roads.

Documents

  • Vehicle Ownership License
  • Driving License.
  • Personal ID.
  • Sketch chart.
  • The authorization document in the event that the service applicant is authorized on behalf of the injured person with the documents mentioned above

Procedures

  • If the nature of the work/excavation at the site does not require a total closure of the street, the procedures are as follows
    - The recipient of the service should refer to the traffic section according to spatial specialization, in order to fill in the part related to the data related to the excavation and its nature, in addition to information about the street (street name / area / neighborhood).
    - The recipient of the service is required to go to the work site with the application form to be field inspected by the head of the traffic department.
    - The site is inspected by the head of the competent traffic department, in order to ascertain the nature of the street in which the excavation is to be carried out, and to determine the appropriate days and times for work.
    - The recipient of the service should review the planning branch / in the capital or the traffic departments / in the governorates, along with the form described to him by the head of the traffic department to complete the transaction.
    Automatic turn number taking.
    Submit the form to the competent employee to complete the procedures.
    But if the nature of work in one of the streets requires a total closure of the street, the procedures are as follows:
    - The contractor must make a sketch drawing specifying the work site, the street to be closed, and the detour path, with the necessary traffic signs and the nature of the traffic safety means that will be used.
    - The plan is presented to the engineers of the Traffic Planning Branch / Studies and Planning Department, for approval after the field inspection of the site.
    The employee checks the submitted papers and the data contained in the form.
    Filling out the permit by the employee with the required data.
    Granting the permit stating all the conditions, signed and stamped with the official seal.

Partners

  • Greater Amman Municipality/bring the electronic permit number - Ministry of Public Works, Housing and Municipalities/to bring an official letter from the competent ministry or municipality.

Fees

  • -

Time expected

  • (5 minutes)
  • (1-2) working days, if the excavation does not require a total closure of the street and does not impede traffic.
  • (2-5) working days, if the excavation requires a total closure of the street

Notes

-

General Notes:

All fields must be filled in to complete the sending process
The responsible employee will check the entered data
We kindly ask you to visit the Traffic Department/Traffic Planning Branch with the following documents to complete the service: Bring a letter from a company + bring a valid license for excavation works in streets and sidewalks (work permit) from: Ministry of Public Works and Housing/ if excavations in streets are within its jurisdiction, Or from the Greater Amman Municipality / to the capital, or from the municipalities / to the governorates + bring a sketch showing the excavation site / street name / area / neighborhood.
The site will be inspected and the appropriate days for the required excavation work will be determined
General Terms:

Full compliance with the preparation of all means of traffic safety before commencing work until the end in full.
Commitment to the Traffic Controls Manual at work sites issued by the Ministry of Public Works and Housing by the owner and contractor.
Return the excavation section to its normal position in front of traffic before leaving the work site.
The work shall be in stages within one direction, so that it is forbidden to move to the next stage until the first stage is finally completed.
Maintaining the flow of traffic on the site without obstruction or disruption and in a secure manner.
It is strictly forbidden to use barrels within the work site.
This permit is considered automatically canceled in the event of any violation of any of the provisions of this permit, especially with regard to traffic safety tools.
Coordinating with the detachment officer before starting work, and walking operations
This permit is not granted to operations: (electricity emergencies, water emergencies, telecommunications emergencies) unless they have obtained approval from the Municipality of Amman or the Ministry of Public Works or Municipalities, each according to its competence, as they are the authorities authorized in this regard on the roads.

 

Work permit (infrastructure)

معلومات الحفرية للمقطع الطولي



معلومات الحفرية للمقطع العرضي